EDIFIS SUD

HomeBathroomAccessoires de salle de bainsAccessoires AxorPorte-savons

Axor

Porte savon Axor Starck circulaire

Product code : 40833000

Collection
Starck
Colour
Chrome-plated
Included
Porte-savon + support mural + fixations
Price on request
Availability · 1 unit
Genuine productManufacturer warrantyEDIFIS after-sales serviceA dedicated contact to support youPrice and availability checkedConfirmed before preparation

In detail

Material, dimensions
and specifications.

Product essentials
  • Fixation encastrée
Specifications for this reference
MontageMural
Distance de perçage35 mm
Diamètre du trou de perçage6 mm
Sales unitUnit
TypePorte-savon mural

Your order in southern Tunisia

Position the accessory correctly

Plan its position alongside the equipment already installed. Check clearance during use, the mounting surface and the finish of the reference before preparing the fixings.

For reference 40833000, gather this information before speaking with EDIFIS.

  • Specify the location, usable dimensions and mounting surface if fixings are required.
  • Compare the finish code with that of nearby fixtures before finalising your selection.

Key details for this reference

Colour: Chrome-plated
Compare this finish with the other fixtures in the room. Colour names do not guarantee the same appearance across two collections.
Montage : Mural
Have the mounting surface and planned connections checked for suitability with this installation method.
Distance de perçage : 35 mm
Mark this measurement on your plan and compare it with the available space. The technical drawing is still needed for recesses and holes.
Diamètre du trou de perçage : 6 mm
Mark this measurement on your plan and compare it with the available space. The technical drawing is still needed for recesses and holes.

For transport, specify your town, delivery address and access restrictions. Product availability and transport time are confirmed separately.

Prepare my enquiry and delivery

Delivery to Sfax, Djerba and southern Tunisia · Cost and lead time confirmed for your project.